Environmental Assessment of Proposed Filbert Substation and Tap Project.
Technical Report
·
OSTI ID:5116174
The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.
- Research Organization:
- USDOE Bonneville Power Administration, Portland, OR. Office of Engineering and Construction
- OSTI ID:
- 5116174
- Report Number(s):
- DOE/EA-0233; ON: DE88008262
- Country of Publication:
- United States
- Language:
- English
Similar Records
East Grangeville Substation : Environmental Assessment.
Alderwood Area Service Environmental Assessment.
Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.
Technical Report
·
Mon Feb 28 23:00:00 EST 1983
·
OSTI ID:5088629
Alderwood Area Service Environmental Assessment.
Technical Report
·
Tue Jun 01 00:00:00 EDT 1982
·
OSTI ID:5177654
Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.
Technical Report
·
Sun May 01 00:00:00 EDT 1983
·
OSTI ID:5301442
Related Subjects
200300 -- Electric Power Engineering-- Power Transmission & Distribution-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
29 ENERGY PLANNING, POLICY, AND ECONOMY
296002 -- Energy Planning & Policy-- Electric Power Transmission & Distribution-- (-1989)
510500* -- Environment
Terrestrial-- Site Resource & Use Studies-- (-1989)
54 ENVIRONMENTAL SCIENCES
AIR QUALITY
BONNEVILLE POWER ADMINISTRATION
COMPLIANCE
CONSTRUCTION
COST ESTIMATION
CULTURAL RESOURCES
ELECTRIC UTILITIES
ENVIRONMENTAL IMPACTS
ENVIRONMENTAL QUALITY
FEDERAL REGION X
FORECASTING
INSTITUTIONAL FACTORS
LAND USE
MITIGATION
NATIONAL ORGANIZATIONS
NORTH AMERICA
OREGON
PLANNING
POWER SUBSTATIONS
POWER TRANSMISSION LINES
PUBLIC UTILITIES
REGULATIONS
RESOURCES
SOCIO-ECONOMIC FACTORS
SOILS
US DOE
US ORGANIZATIONS
USA
WATER QUALITY
WILD ANIMALS
24 POWER TRANSMISSION AND DISTRIBUTION
29 ENERGY PLANNING, POLICY, AND ECONOMY
296002 -- Energy Planning & Policy-- Electric Power Transmission & Distribution-- (-1989)
510500* -- Environment
Terrestrial-- Site Resource & Use Studies-- (-1989)
54 ENVIRONMENTAL SCIENCES
AIR QUALITY
BONNEVILLE POWER ADMINISTRATION
COMPLIANCE
CONSTRUCTION
COST ESTIMATION
CULTURAL RESOURCES
ELECTRIC UTILITIES
ENVIRONMENTAL IMPACTS
ENVIRONMENTAL QUALITY
FEDERAL REGION X
FORECASTING
INSTITUTIONAL FACTORS
LAND USE
MITIGATION
NATIONAL ORGANIZATIONS
NORTH AMERICA
OREGON
PLANNING
POWER SUBSTATIONS
POWER TRANSMISSION LINES
PUBLIC UTILITIES
REGULATIONS
RESOURCES
SOCIO-ECONOMIC FACTORS
SOILS
US DOE
US ORGANIZATIONS
USA
WATER QUALITY
WILD ANIMALS