Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

ASTR and GTR instrumentation modernization. Report for 1 October 1964-1 January 1966

Technical Report ·
OSTI ID:5115500
Certain items of GTR, ASTR, and facility equipment were modified or replaced to provide safer and more reliable reactor operation. A reliable alarm system indicating potentially dangerous and unsafe conditions in the nuclear area was designed and installed. Trip circuits were procured, tested, and installed as the power-level-indicating and level-scram channels were modified to increase their reliability. A magnet power supply for the GTR, compatible with the modified scram channels, was designed and installed. Identical Log-N and Period channels were procured and installed in the GTR and ASTR. The response of the modified channels to a step input was evaluated.
Research Organization:
General Dynamics Corp., Fort Worth, TX (USA). Nuclear Aerospace Research Facility
OSTI ID:
5115500
Report Number(s):
AD-489440/8/XAB; FZK-295
Country of Publication:
United States
Language:
English