Industrial fuel gas demonstration plant program. Overall program plan for Task IX. Technical support. Volume II. Pilot plant operations. (Deliverable No. 46)
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical Support) of the Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582. Volume I presents the schedule and organization for carrying out the overall plan which is divided into three major tasks: Bench Scale Tests, Cold-Flow Model Studies, and Pilot Plant Operations. This volume, Volume II, gives a more detailed presentation of the test objectives and procedures for the most important part of the plan, Pilot Plant Operations. The objective of Volume II is to provide a systematic approach to obtain high carbon conversion under steady-state, ash agglomerating conditions with coal in the U-GAS pilot plant. This will allow the achievement of the principal goal of pilot plant operations, that is, to obtain data for the design of the U-GAS demonstration plant. The test program for pilot plant operations has been formulated with the assistance of the Technical Subcommittee which has members from all the parties involved in the Industrial Fuel Gas Demonstration Plant Program, namely, Memphis Light, Gas and Water Division, Department of Energy, Foster Wheeler Energy Corporation, Delta Refining Company, Institute of Gas Technology, and Monsanto Research Corporation.
- Research Organization:
- Memphis Light, Gas and Water Div., TN (USA)
- DOE Contract Number:
- AC02-77ET13046
- OSTI ID:
- 5113875
- Report Number(s):
- DOE/ET/13046-T14
- Country of Publication:
- United States
- Language:
- English
Similar Records
Memphis demonstration plant program
Industrial Fuel Gas Demonstration Plant Program. Task III report, demonstration plant mechanical design. Volume I. Overall plant description