Industrial fuel gas demonstration plant program. Construction permit. Compliance plan. (Deliverable No. 31)
The objective of this compliance plan is to insure that all required permits are filed and obtained prior to the start of construction of the U-gas demonstration plant. This plan addresses the permits in the following areas: construction, electrical, mechanical, plumbing, federal aviation lighting, and as-required permits. Each permit area is introduced by a brief summary of the permits required and the significant circumstances and/or conditions affecting permit acquisition. Each permit is then discussed in detail according to a format which includes the following: brief introduction of permit, responsible regulator agency, other potential reviewing agency(s), information needed for permit, filing procedures, normal review period, permit duration period, and permit fees. Copies of the actual application forms, guidelines for completing the applications, statements on required information and agency contacts are contained in the Appendices.
- Research Organization:
- Memphis Light, Gas and Water Div., TN (USA)
- DOE Contract Number:
- AC02-77ET13046
- OSTI ID:
- 5113809
- Report Number(s):
- DOE/ET/13046-T17
- Country of Publication:
- United States
- Language:
- English
Similar Records
Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan
Guidance manual for the preparation of NPDES permit applications for storm-water discharges associated with industrial activity
Opening a coal mine in Colorado: the state permits and permit-review procedures
Technical Report
·
Wed Oct 31 23:00:00 EST 1979
·
OSTI ID:5090971
Guidance manual for the preparation of NPDES permit applications for storm-water discharges associated with industrial activity
Technical Report
·
Sun Mar 31 23:00:00 EST 1991
·
OSTI ID:6012177
Opening a coal mine in Colorado: the state permits and permit-review procedures
Technical Report
·
Fri Aug 01 00:00:00 EDT 1980
·
OSTI ID:5410922