Criteria for phase-to-phase clearances of HV substations

Journal Article · · IEEE (Institute of Electrical and Electronics Engineers) Transactions on Power Delivery; (USA)
DOI:https://doi.org/10.1109/61.107266· OSTI ID:5100976
; ;  [1]
  1. GE Industry and Utility Sales, Schenectady, NY (US)

To facilitate uprating of HV substations, the paper re-examines line-to-line insulation design criteria. The basis for existing practices and the principles of line-to-line lightning surge overvoltage stresses are reviewed. Results of a digital study for a realistic substation are presented. The conclusions show that the line-to-line stresses, as limited by surge arresters, are substantially higher than line-to-ground stresses. This represents increased requirements as compared to existing standards. However, due to low protective levels of modern arresters, substantial reduction of line-to-line clearances is still feasible.

OSTI ID:
5100976
Journal Information:
IEEE (Institute of Electrical and Electronics Engineers) Transactions on Power Delivery; (USA), Journal Name: IEEE (Institute of Electrical and Electronics Engineers) Transactions on Power Delivery; (USA) Vol. 5:1; ISSN 0885-8977; ISSN ITPDE
Country of Publication:
United States
Language:
English