Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pipeline gas demonstration plant: Phase I, abbreviated version of conceptual commercial plant design. Volume 1. Section 1, executive summary; Section 2, commercial plant description

Technical Report ·
DOI:https://doi.org/10.2172/5091732· OSTI ID:5091732
The comprehensive analyses and studies in conjunction with the successful implementation of the Technical Support Plan have confirmed that: The COGAS Process is ready for demonstration. The technical risk is inherently low and there is a high probability of operating feasibility and economic viability for the Commercial Plant. The use of commercially proven process technology and commercially available components has been maximized to reduce technical risk. The integration of multiple processes is technically feasible and desirable resulting in a high thermal yeild. The process is safe, reliable and environmentally acceptable. The plant is inherently flexible having a high turndown ratio. The design changes required in order to process various coal types have been identified and are achievable.
Research Organization:
Illinois Coal Gasification Group, Chicago (USA)
DOE Contract Number:
AC01-77ET13031
OSTI ID:
5091732
Report Number(s):
FE-2012/Z/80/06(Vol.1)
Country of Publication:
United States
Language:
English