Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pipeline gas demonstration plant: Phase I, abbreviated version of conceptual commercial plant design. Volume 4. Section 5, plant operating concept; Section 6, products and byproducts; Section 7, economic assessment

Technical Report ·
DOI:https://doi.org/10.2172/5091728· OSTI ID:5091728
This volume contains sections 5, 6, and 7. Section 5 provides a description of the plant personnel and plant operations, an outline of start up and shutdown procedures, and a brief description of plant shakedown, system testing, maintenance, safety and laboratory support. Section 6 describes the products and byproducts which will be produced by the Commercial Plant and discusses their marketability. Section 7 presents an economic assessment of the Conceptual Commercial Plant including estimated capital requirements, operating costs, a discounted cash flow analysis to determine the required gas selling price, and an analysis of the sensitivity of the gas selling price to various economic factors.
Research Organization:
Illinois Coal Gasification Group, Chicago (USA)
DOE Contract Number:
AC01-77ET13031
OSTI ID:
5091728
Report Number(s):
FE-2012/Z/80/06(Vol.4)
Country of Publication:
United States
Language:
English