Design and operational energy studies in a new high-rise office building. Volume 4. Building automation analysis
Technical Report
·
OSTI ID:5091538
The objectives of the analysis are to evaluate the application of a number of building automation system capabilities using the Park Plaza Building as a case study. The study looks at the energy and cost effectiveness of some energy management strategies of the building automation system as well as some energy management strategies that are not currently a part of the building automation system. The strategies are also evaluated in terms of their reliability and usefulness in this building.
- Research Organization:
- Tishman Research Corp., New York (USA)
- DOE Contract Number:
- AC02-79CS20271
- OSTI ID:
- 5091538
- Report Number(s):
- DOE/CS/20271-4; ON: DE84010687
- Resource Relation:
- Other Information: Portions are illegible in microfiche products. Original copy available until stock is exhausted
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design methodology analysis: design and operational energy studies in a new high-rise office building. Volume 2
Design and operational energy studies in a new high-rise office building. Volume 5. DOE-2: comparison with measured data
Project description: design and operational energy studies in a new high-rise office building. Volume 1
Technical Report
·
Tue Feb 01 00:00:00 EST 1983
·
OSTI ID:5091538
Design and operational energy studies in a new high-rise office building. Volume 5. DOE-2: comparison with measured data
Technical Report
·
Thu Mar 01 00:00:00 EST 1984
·
OSTI ID:5091538
Project description: design and operational energy studies in a new high-rise office building. Volume 1
Technical Report
·
Thu Dec 01 00:00:00 EST 1983
·
OSTI ID:5091538