Negative-ion based NBI system for JT-60U
- Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; and others
A 500 keV negative-ion based NBI system is under construction for NB current drive and plasma core heating in high density plasma in JT-60U. Part of the beamline and the high voltage power supply required for a verification test of an ion source was completed in March 1995. After having done a high potential test of the power supply, the negative-ion generation and acceleration tests started in June 1995 aiming at deuterium beams of 500 keV, 22A. In initial experiment, deuterium negative-ion beams of 410 keV, 6.1A (2.5 MW) for 0.2 sec, so far, have been achieved. This is the world highest D{sup {minus}} current and negative ion beam power. The construction of the total system will be completed by the beginning of 1996, and the beam injection will start in March 1996.
- OSTI ID:
- 505900
- Report Number(s):
- CONF-950905-; ISBN 0-7803-2970-8; TRN: 97:013593
- Resource Relation:
- Conference: 16. IEEE/NPSS symposium on fusion engineering, Champaign, IL (United States), 1-5 Oct 1995; Other Information: PBD: 1995; Related Information: Is Part Of 1995 IEEE 16. symposium on fusion engineering. Volume 1; Miley, G.H.; Elliott, C. [eds.] [Univ. of Illinois, Urbana, IL (United States). Fusion Studies Lab.]; PB: 886 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Beam acceleration test in negative-ion based NBI system for JT-60U
Long Pulse Operation on NBI Systems for JT-60U