Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Occidental vertical modified in-situ process for the recovery of oil from oil shale: Phase II. Final report, June 1, 1979-August 31, 1981

Technical Report ·
DOI:https://doi.org/10.2172/5058807· OSTI ID:5058807
Phase II of the Cooperative Agreement between the Department of Energy (DOE) and Occidental Oil Shale, Inc. (OOSI) has the primary objective of simultaneously processing two commercial-size modified in situ (MIS) retorts. Most of the data obtained from this program will appear in the Summary Report to be issued six months after the completion of Phase II. This Final Report summarizes the progress of the project through August 19, 1981, the effective data of the DOE discontinuance of funding. As agreed under Modification 014 to the Agreement, there will be no reports between this Final Report and the Summary Report. Through the Discontinuance, the work covered in Phase II include: mining for, and formation of, Retorts 7, 8, and Room 8X (R7, 8, and 8X); construction of processing facilities; installation of mine stability and processing instrumentation; collection and analysis of a R7 and 8 core; execution of a mini-retort blast and ignition test program; and continuous environmental support.
Research Organization:
Occidental Oil Shale, Inc., Grand Junction, CO (USA)
DOE Contract Number:
FC20-79LC10036
OSTI ID:
5058807
Report Number(s):
DOE/LC/10036-T11; ON: DE82018560
Country of Publication:
United States
Language:
English