Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

KEK accelerator facilities and Tristan project

Conference · · IEEE Trans. Nucl. Sci.; (United States)
OSTI ID:5058284
KEK 12 GeV PS continues stable operation and the maximum beam intensity has reached 4.1*10/sup 12/ ppp, over twice of the design value. Since last June the booster delivers the 500 MeV protons to the Booster Synchrotron Utilization Facility (BSF), and pulsed neutrons and pulsed mesons are successfully produced. The 2.5 GeV electron linac and the storage ring, dedicated for a synchrotron radiation facility, will be completed in one year. The new version of TRISTAN plan has a 25 GeV electron ring and a 300 GeV proton ring. The e/sup +/-e/sup -/ ring of 30 GeV is constructed from FY 1981 as phase I of TRISTAN. 8 refs.
Research Organization:
KEK, Ibaraki, Jpn
OSTI ID:
5058284
Report Number(s):
CONF-810314-
Conference Information:
Journal Name: IEEE Trans. Nucl. Sci.; (United States) Journal Volume: NS-28:3
Country of Publication:
United States
Language:
English

Similar Records

KEK fast cycling booster
Conference · Wed Jun 01 00:00:00 EDT 1977 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:7285617

Present status of polarized proton beam at KEK
Conference · Fri Dec 31 23:00:00 EST 1982 · AIP Conf. Proc.; (United States) · OSTI ID:6111700

The KEK PS polarized beam program
Conference · Fri May 05 00:00:00 EDT 1989 · AIP Conference Proceedings (American Institute of Physics); (USA) · OSTI ID:5056380