Pulverized coal injection operation on CSC No. 3 blast furnace

Conference ·
OSTI ID:504686
;  [1]
  1. China Steel Corp., Kaohsiung (Taiwan, Province of China)
The pulverized coal injection system was introduced for the first time in No. 1 and No. 2 blast furnace at China Steel Corporation (CSC) in 1988. Currently the coal injection rate for both blast furnaces has steadily risen to 70--89 kg/thm (designed value). No 3 blast furnace (with an inner volume of 3400 m3) was also equipped with a PCI system of Armco type and started coal injection on November 17, 1993. During the early period, some problems such as injection lance blocking, lance-tip melting down, flexible hose wear, grind mill tripping occasionally interrupted the stable operation of blast furnace. After a series of efforts offered on equipment improvement and operation adjustment, the PC rate currently reaches to 90--110 kg/thm and furnace stable operation is still being maintained with productivity more than 2.20.
OSTI ID:
504686
Report Number(s):
CONF-960954--
Country of Publication:
United States
Language:
English

Similar Records

Pulverized coal injection at Hoogovens
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:43041

Pulverized coal injection (PCI) at Inland`s No. 7 blast furnace
Book · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:129065

Numerical analysis for the multi-phase flow of pulverized coal injection inside blast furnace tuyere
Journal Article · Thu Sep 01 00:00:00 EDT 2005 · Applied Mathematical Modelling · OSTI ID:20647589