Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

AGT101 Advanced Gas Turbine Technology update

Conference ·
OSTI ID:5041938
The Garrett/Ford Advanced Gas Turbine Technology Development Program, designated AGT101, has made significant progress during 1985 encompassing ceramic engine and ceramic component testing. Engine testing has included full speed operation to 100,000 rpm and 1149C (2100F) turbine inlet temperature, initial baseline performance mapping and ceramic combustor start and steady state operation. Over 380 hours of test time have been accumulated on four development engines. High temperature foil bearing coatings have passed rig test and a thick precious metal foil coating selected for engine evaluation. Ceramic structures have been successfully rig tested at 1371C (2500F) for over 27 hours.
Research Organization:
Garrett Turbine Engine Co., A Div. of The Garrett Corp., AGT101 Project, Phoenix, AZ
OSTI ID:
5041938
Report Number(s):
CONF-860635-
Country of Publication:
United States
Language:
English