Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Evaluation of operational constraints in continuous mining systems. Volume III. Longwall simulation model

Technical Report ·
OSTI ID:5000811
This report describes the development of a dynamic model for simulating the behavior of a longwall coal production system. The performance of the longwall system is simulated for varying coalbed parameters and such equipment factors as pick and drum design, armored face conveyor capacities and roof support capability. The model calculates the size and density of support; the cutting force power requirements and haulage speed for the loader-shearer; the conveyor size, speed and power requirements; and delay generation at heat and tailgates and at the longwall face. Simulated results are compared with actual results from an operating mine.
Research Organization:
Pennsylvania State Univ., University Park (USA). Dept. of Mineral Engineering
DOE Contract Number:
FG01-76ET12171
OSTI ID:
5000811
Report Number(s):
FE-8982-T1(Vol.3)
Country of Publication:
United States
Language:
English

Similar Records

Longwall mining system
Patent · Tue May 10 00:00:00 EDT 1983 · OSTI ID:5971609

Longwall mining at Meiyukou colliery
Journal Article · Mon Oct 01 00:00:00 EDT 1979 · World Coal; (United States) · OSTI ID:5750858

Longwall mining in Illinois
Conference · Wed Dec 31 23:00:00 EST 1980 · OSTI ID:6107613