Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Par Pond vegetation status Summer 1995 -- September survey descriptive summary

Technical Report ·
DOI:https://doi.org/10.2172/491490· OSTI ID:491490
The water level of Par Pond was lowered approximately 20 feet in mid-1991 in order to protect downstream residents from possible dam failure suggested by subsidence on the downstream slope of the dam and to repair the dam. This lowering exposed both emergent and nonemergent macrophyte beds to drying conditions resulting in extensive losses. A survey of the emergent shoreline aquatic plant communities began in June 1995, three months after the refilling of Par Pond to approximately 200 feet above mean sea level and continued with this mid-September survey. Communities similar to the pre-drawdown Par Pond aquatic plant communities are becoming re-established; especially, beds of maidencane, lotus, waterlily, and watershield are now extensive and well established. Cattail occurrence continues to increase, but large beds common to Par Pond prior to the drawdown have not formed. Future surveys during the late growing seasons of 1995, and throughout 1996 and 1997, along with the evaluation of satellite data to map the areal extent of the macrophyte beds of Par Pond, are planned.
Research Organization:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-89SR18035
OSTI ID:
491490
Report Number(s):
WSRC-RP--95-0891; ON: DE97060144
Country of Publication:
United States
Language:
English

Similar Records

Par Pond vegetation status Summer 1995 -- Summary
Technical Report · Sun Dec 31 23:00:00 EST 1995 · OSTI ID:491492

Par Pond vegetation status Summer 1995 -- October survey descriptive summary
Technical Report · Tue Oct 31 23:00:00 EST 1995 · OSTI ID:491493

Par Pond vegetation status 1996
Technical Report · Sat Nov 30 23:00:00 EST 1996 · OSTI ID:491494