PRE-AND POST-SHOT MINE SURVEY. Summary Report
Technical Report
·
OSTI ID:4829485
A program to assess damage from Project GNOME, if such should occur, was initiated about 90 days prior to the nuclear test and continued for about two weeks following the test. Mines, shafts, and surface plants of all seven of the potash companies in the area were included in the survey. Methods employed in the assessment program included: visual and photographic inspection; surface profile surveys; underground profile surveys; underground and surface seismic recordings; radiation surveys; microseismic surveys; and water level surveys. No visible or apparent damage was evidenced in the mines. (auth)
- Research Organization:
- Bureau of Mines, Washington, D.C.
- NSA Number:
- NSA-16-020048
- OSTI ID:
- 4829485
- Report Number(s):
- PNE-134F
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
SEISMIC MEASUREMENTS BY THE U.S. GEOLOGICAL SURVEY DURING THE PRE-GNOME HIGH-EXPLOSIVES TESTS NEAR CARLSBAD, NEW MEXICO. Final Report
PRE-SHOT AND POSTSHOT STRUCTURE SURVEY. Final Report
VISUAL AND PHOTOGRAPHIC ON-SITE INSPECTION. Final Report
Technical Report
·
Thu Mar 31 23:00:00 EST 1960
·
OSTI ID:4187897
PRE-SHOT AND POSTSHOT STRUCTURE SURVEY. Final Report
Technical Report
·
Sat Mar 31 23:00:00 EST 1962
·
OSTI ID:4839587
VISUAL AND PHOTOGRAPHIC ON-SITE INSPECTION. Final Report
Technical Report
·
Fri Jun 01 00:00:00 EDT 1962
·
OSTI ID:4734476