Title: DISPOSAL OF LIQUID WASTE IN THE DURANGO-TYPE URANIUM MILLING FLOWSHEET

Technical Report ·
OSTI ID:4828954

Possible modifications were studied in conventional uraniuum ore- processing steps to confine and permit controlled disposal of radioactive wastes. Surveys of Ra/sup 226/ contamination of liquid wastes from uranium mills indicated that the Vanadium Corporation of America plant at Durango, Colo., had one of the more urgent problems. A possible procedure for minimizing the waste disposal problem was to reuse the waste solution in the mill-in effect, erasing the need for disposal of liquid waste. In examining this possibility, interlocked bench-scale leaching and solvent extraction tests simulating the Durango fiowsheet were made. The simulated reuse of barren raffinate for leaching and washing was carried through three separate campaigns of 9, 12, and 35 cycles each. An attempt to expedite the test work by using agitation leaching during the first campaign resulted in pregnant solutions of varying turbidity, giving a discordant pattern of radioactivity analyses. Percolation leaching and washing patterned more nearly after the Durango flowsheet was used in the second and third campaigns and consistently gave solutions of satisfactory clarity. The radioactivity was somewhat variable but did not build up with prolonged recycling of the raffinate. The buildup of other impurities in the pregnant solution had little noticeabIe effect on the operation of the percolation leach column. Operational difficulties from slow phase disengagement and entrainment in the solvent extraction stripping and scrubbing units occurred during the first two campaigns. In the third campaign slow phase disengagement and aqueous entrainment in the strippers were practically eliminated by heating the last stage to about 40 deg C and operating with the aqueous phase continuous. Increased mixing time in the scrubbing section was successful in reducing entrainment of aqueous in the organic from the settlers. Also, the concentrations of active reagents in the solvent extraction system were increased during the third campaign to correspond to an increase made at the Durango plant. The recovery of uranium and vanadium from the acid leach solution was excellent, averaging 99.7 and 95.6%, respectively. During the test work the Durango plant made several changes in tailing disposal procedures to minimize the waste problem. The most important comprised impounding all barren raffinate in two large lagoons. This was a successful temporary solution to the problem. However, as evaporation is relied upon to eliminate the water, it is estimated that 40 acres of area will be needed. The use of barren raffinate for washing in the Durango process would greatly diminish the quantity of solution to be disposed of by solar evaporation and the conjunctive need for a large disposal area. (auth)

Research Organization:
Bureau of Mines. Salt Lake City Metallurgy Research Center
NSA Number:
NSA-16-002797
OSTI ID:
4828954
Report Number(s):
BM-RI-5874
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-62
Country of Publication:
Country unknown/Code not available