skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Conceptual Design for Consolidation TCAP

Technical Report ·
DOI:https://doi.org/10.2172/4820· OSTI ID:4820

Two alternate Thermal Cycling Absorption Process (TCAP) designs have been developed for the Tritium Facility Modernization and Consolidation (TFM and C) Project. The alternate designs were developed to improve upon the existing Replacement Tritium Facility (RTF) TCAP design and to eliminate the use of building distributed hot and cold nitrogen system.A brief description of TCAP theory and modeling is presented, followed by an overview of the design criteria for the Isotope Separation System (ISS). Both designs are described in detail, along with a generic description of the complete TCAP system. A design is recommend for the Consolidation Project, and a development plan for both designs is proposed.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
4820
Report Number(s):
WSRC-TR-97-00340; TRN: US0101536
Resource Relation:
Other Information: PBD: 22 Feb 1999
Country of Publication:
United States
Language:
English