Conceptual Design for Consolidation TCAP
Two alternate Thermal Cycling Absorption Process (TCAP) designs have been developed for the Tritium Facility Modernization and Consolidation (TFM and C) Project. The alternate designs were developed to improve upon the existing Replacement Tritium Facility (RTF) TCAP design and to eliminate the use of building distributed hot and cold nitrogen system.A brief description of TCAP theory and modeling is presented, followed by an overview of the design criteria for the Isotope Separation System (ISS). Both designs are described in detail, along with a generic description of the complete TCAP system. A design is recommend for the Consolidation Project, and a development plan for both designs is proposed.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 4820
- Report Number(s):
- WSRC-TR-97-00340; TRN: US0101536
- Resource Relation:
- Other Information: PBD: 22 Feb 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pd/k for RTF and 232-H TCAP units
HT TCAP Loading Results for the Tritium Facility Modernization and Consolidation Project (S-7726)
Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)
Conference
·
Tue Jan 29 00:00:00 EST 1991
·
OSTI ID:4820
HT TCAP Loading Results for the Tritium Facility Modernization and Consolidation Project (S-7726)
Technical Report
·
Mon Sep 23 00:00:00 EDT 2002
·
OSTI ID:4820
Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)
Technical Report
·
Fri Nov 14 00:00:00 EST 1997
·
OSTI ID:4820