Zircaloy-2 lined zirconium barrier fuel cladding
Conference
·
OSTI ID:479459
- General Electric Nuclear Energy, Wilmington, NC (United States)
- General Electric Nuclear Energy, Pleasanton, CA (United States)
The introduction of Zr-lined barrier fuel clad tubing by GE in the early 1980s to counter the pellet-clad interaction (PCI) failure mechanism in fuel for boiling water reactors provided a major improvement in fuel reliability and operational flexibility. While the frequency of fuel failures has been substantially reduced in the past decade, an increased tendency has been observed for failed fuel rods to exhibit post-failure degradation in the form of longer cracks that allow release of radioactive off-gas and contamination of the reactor coolant circuit with tramp fuel material. One factor involved in this degradation is hydriding of the cladding at a location remote from the initial perforation of the fuel rod. This local hydriding can lead to a secondary crack initiation in the cladding when stressed by the fuel expansion accompanying a power increase. A modification of Zr-lined barrier fuel clad tubing has been developed to retard post-failure local hydriding while retaining the proven PCI resistance of the high-purity sponge Zr barrier. By adding a thin inner layer of corrosion-resistant Zircaloy-2 bonded to the inner surface of the Zr-barrier tube, the resistance to internal corrosion and hydrogen generation in a perforated fuel cladding tube is made equivalent to that of an all-Zircaloy-2 tube. Tests show that the PCI mitigating capability of the Zr barrier. By adding a thin layer of corrosion-resistant Zircaloy-2 bonded to the inner surface of the Zr-barrier tube, the resistance to internal corrosion and hydrogen generation in a perforated fuel cladding tube is made equivalent to that of an all-Zircaloy-2 tube. Tests show that the PCI mitigating capability of the Zr barrier is not compromised by this inner Zircaloy-2 liner. Materials considerations and manufacturing technology used to integrate this optional inner liner with other Zr barrier tubing properties and performance requirements are discussed with a summary of testing experience.
- OSTI ID:
- 479459
- Report Number(s):
- CONF-950926--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Demonstration of fuel resistant to pellet-cladding interaction. Phase I. Final report
Demonstration of fuel resistant to pellet-cladding interaction. Second semiannual report, January--June 1978. [BWR]
Demonstration of fuel resistant to pellet-cladding interaction. Phase 2. First semiannual report, January-June 1979. [BWR]
Technical Report
·
Thu Mar 01 04:00:00 UTC 1979
·
OSTI ID:6019484
Demonstration of fuel resistant to pellet-cladding interaction. Second semiannual report, January--June 1978. [BWR]
Technical Report
·
Fri Sep 01 04:00:00 UTC 1978
·
OSTI ID:6528952
Demonstration of fuel resistant to pellet-cladding interaction. Phase 2. First semiannual report, January-June 1979. [BWR]
Technical Report
·
Wed Aug 01 04:00:00 UTC 1979
·
OSTI ID:5847691