Title: CIVILIAN POWER REACTOR PROGRAM. PART III. STATUS REPORT ON LARGE (100 AND 300 MWe) HEAVY WATER-MODERATED POWER REACTORS--AS OF 1960

Technical Report ·
DOI:https://doi.org/10.2172/4789688· OSTI ID:4789688

An evaluation of 300- and 100-Mwe power plants was conducted using ground rules prescribed by the USAEC for this study. Costs corresponding to two average discharged fuel burnups are: 8.6 mills/kwh (8500 Mwd/ metric ton) and 8.8 mills/kwh (7500 Mwd/metric ton) for the 300-Mw plant. Costs for the 100 Mw plant are 14.7 mills/kwh for an average discharged fuel burnup of 6010 Mwd/metric ton. Estimates of future potential indicate that the 300 Mw/sub 3/ (8500 Mwd/metric ton) plant could produce power for 7.3 mills/kwh in a second generation, full scale plant of the same type. A further reduction to 6.4 mills/kwh should be possible as the result of the recommended ten-year development program. The current development program is adequate for providing the data needed to design and construct a prototype reactor. However, there is no natural U-fueled prototype and no prototype of the chosen reference design scheduled in the U.S. Current technology is sufficiently developed to initiate the design and construction of a pressure tube, boiling D/sub 2/Ocooled, natural UO/sub 2/- fueled reactor prototype plant in the immediate future. This plant would demonstrate the main features of a full scale plant and, in addition. would provide design data which could only be obtained by operation of a natural U- fueled reactor. (auth)

Research Organization:
Nuclear Development Corp. of America, White Plains, NY (United States)
DOE Contract Number:
AT(30-1)-2303(XIV)
NSA Number:
NSA-16-031264
OSTI ID:
4789688
Report Number(s):
NDA-2153-3
Resource Relation:
Other Information: Orig. Receipt Date: 31-DEC-62
Country of Publication:
United States
Language:
English