Plutonium Immobilization Puck Handling

Conference ·
OSTI ID:4789

The Plutonium Immobilization Project (PIP) will immobilize excess plutonium and store the plutonium in a high level waste radiation field. To accomplish these goals, the PIP will process various forms of plutonium into plutonium oxide, mix the oxide powder with ceramic precursors, press the mixture into pucks, sinter the pucks into a ceramic puck, load the pucks into metal cans, seal the cans, load the cans into magazines, and load the magazines into a Defense Waste Processing Facility (DPWF) canister. These canisters will be sent to the DWPF, an existing Savannah River Site (SRS) facility, where molten high level waste glass will be poured into the canisters encapsulating the ceramic pucks. Due to the plutonium radiation, remote equipment will perform these operations in a contained environment. The Plutonium Immobilization Project is in the early design stages and the facility will begin operation in 2005. This paper will discuss the Plutonium Immobilization puck handling conceptual design and the puck handling equipment testing.

Research Organization:
Savannah River Site
Sponsoring Organization:
DOE
DOE Contract Number:
AC09-96SR18500
OSTI ID:
4789
Report Number(s):
WSRC-MS-98-00897; ON: DE00004789
Country of Publication:
United States
Language:
English

Similar Records

Plutonium Immobilization Project -- Can loading
Conference · Mon Jan 17 23:00:00 EST 2000 · OSTI ID:750866

Plutonium Immobilization Can Loading Conceptual Design for 13 MT Case
Technical Report · Tue Jan 30 23:00:00 EST 2001 · OSTI ID:774273

Plutonium Immobilization Project Can Loading and Puck Handling Vision Software
Technical Report · Mon Sep 10 00:00:00 EDT 2001 · OSTI ID:786599