ISRAEL RESEARCH REACTOR IRR-1. PART II. STARTUP TESTS
Technical Report
·
OSTI ID:4786779
ABS>Tests made during the pre-critical, approach to critical, and low power experiments, and during initial operation at 1 Mw of the Israel Research Reactor-I are described. Critical experiments, control rod calibrations, neutron flux measurements and the reactivity effects of temperature and experimental facilities are included. Core loadings with available excess reactivities (% DELTA K) of 0.37 to 4.32%, and 0.24 to 2.03%, respectively, were tested in the pool and stall positions. The regulating rod worths obtained for different core loadings and with various control rod settings ranged from 0.285 to 0.367% DELTA K. The shimrod worths for core loading SK 1 were in the 2.3 to 3.7% range. The shim-rod bank of 5 shim-rods, withdrawn to the 60% setting was worth 11.3% excess reactivity, indicating that the reactor had sufficient control capacity. The re activity effect of the facilities around the stall position was about 1.37% DELTA K for core loading SK 1. The total worth of water filling all the beam tubes was 1.24%, and the effect of material in the pneumatic tubes was negligible. The temperature coefficient of reactivity was --3.6 x 10/sup -4/ per degree at 30.3 deg C. (auth)
- Research Organization:
- Israel. Atomic Energy Commission, Tel Aviv
- NSA Number:
- NSA-16-030134
- OSTI ID:
- 4786779
- Report Number(s):
- IA-686
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
Nuclear Startup and Statics of PBF Reactor
STARTUP AND MIDLIFE MOCKUP EXPERIMENTS FOR SM-1, SM-1A, AND PM-2A WITH TYPE 3 ELEMENTS
ML-1-1B CRITICAL-ASSEMBLY STUDIES
Technical Report
·
Mon Jul 01 00:00:00 EDT 1974
·
OSTI ID:1462033
STARTUP AND MIDLIFE MOCKUP EXPERIMENTS FOR SM-1, SM-1A, AND PM-2A WITH TYPE 3 ELEMENTS
Technical Report
·
Wed Jan 09 23:00:00 EST 1963
·
OSTI ID:4749314
ML-1-1B CRITICAL-ASSEMBLY STUDIES
Technical Report
·
Mon Feb 20 23:00:00 EST 1961
·
OSTI ID:4067004