ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Semiannual Progress Report, January 1 through June 30, 1962
Technical Report
·
OSTI ID:4771216
Highlights of the work performed in connection with the Army Gas-Cooled Reactor Systems Program for the period January through June 1962 are discussed. The program includes the Gas-Cooled Reactor Experiment; the ML-1, a prototype mobile gas-cooled nuclear power plant; the ML1A; and an advanced systems project. The purpose of the program is to develop a mobile nuclear power plant suitable for military field use (the ML-1A). A core test facility was operated at the AEC's NRTS (the GCRE) to provide information for use in designing and developing the ML-1, a prototype power plant, now being tested at NRTS. Background information on the Gas Turbine Test Facility is included. Progress on these projects is reported with information on associated tests and data evalu ation, and the status of experimental and prototype components. (auth)
- Research Organization:
- Aerojet-General Nucleonics, San Ramon, Calif.
- NSA Number:
- NSA-16-032576
- OSTI ID:
- 4771216
- Report Number(s):
- IDO-28590
- Country of Publication:
- United States
- Language:
- English
Similar Records
ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM SEMIANNUAL PROGRESS REPORT FOR JULY 1 THROUGH DECEMBER 31, 1959
THE ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Semiannual Progress Report for July 1 through December 31, 1961
ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Semiannual Progress Report, January 1-June 30, 1961
Technical Report
·
Sun Feb 14 23:00:00 EST 1960
·
OSTI ID:4167061
THE ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Semiannual Progress Report for July 1 through December 31, 1961
Technical Report
·
Tue Feb 27 23:00:00 EST 1962
·
OSTI ID:4792651
ARMY GAS-COOLED REACTOR SYSTEMS PROGRAM. Semiannual Progress Report, January 1-June 30, 1961
Technical Report
·
Thu Aug 10 00:00:00 EDT 1961
·
OSTI ID:4832788