CAC-880 Pu RECLAMATION FACILITY--Z PLANT GLOVE BOX DESIGN STUDY
Technical Report
·
OSTI ID:4747839
Design studies for the Plutorium Reclamation Facility called for the main process equipment to be mounted on walls of a canyon cell with all piping from each vessel brought out through plugs in the 2-ft-thick concrete wall to a shielded glove box hood where all interconnecting equipment such as piping, valves, controls, and pumps are located. The space requirements precluded designing the main process glove boxes with the size limitations recommended by the initial study. Therefore, a study was made to extend the size of the hoods. Recommendations are given for glove-box depth, maximum distance from glove ports to top or bottom of hood, horizontal glove port spacing, viewing windows and their location, vertical spacing of glove ports, working and equipment location areas with the hoods, and required platform heights. (M.C.G.)
- Research Organization:
- General Electric Co. Hanford Atomic Products Operation, Richland, Wash.
- DOE Contract Number:
- AT(45-1)-1350
- NSA Number:
- NSA-17-016141
- OSTI ID:
- 4747839
- Report Number(s):
- HW-68442
- Country of Publication:
- United States
- Language:
- English
Similar Records
PLUTONIUM RECLAMATION FACILITY--HUMAN ENGINEERING CONSIDERATIONS FOR GLOVE BOX DESIGN
SHIELDING REQUIREMENTS FOR NPR PRODUCTION IN PLUTONIUM RECLAMATION FACILITY- PROJECT CAC-880
DEVELOPMENT OF GAMMA AND NEUTRON RADIATION DATA FOR THREE ALTERNATE DESIGN CONCEPTS FOR THE PLUTONIUM RECLAMATION FACILITY, PROJECT CAC-880
Technical Report
·
Tue Apr 26 00:00:00 EDT 1960
·
OSTI ID:4723551
SHIELDING REQUIREMENTS FOR NPR PRODUCTION IN PLUTONIUM RECLAMATION FACILITY- PROJECT CAC-880
Technical Report
·
Sat Dec 31 23:00:00 EST 1960
·
OSTI ID:4819081
DEVELOPMENT OF GAMMA AND NEUTRON RADIATION DATA FOR THREE ALTERNATE DESIGN CONCEPTS FOR THE PLUTONIUM RECLAMATION FACILITY, PROJECT CAC-880
Technical Report
·
Sat Dec 31 23:00:00 EST 1960
·
OSTI ID:4843176