THE TORY II-A REACTOR PROGRAM

Technical Report ·
OSTI ID:4684741
The design requirements, the findamental design problems, and the test facility for the Tory II-A reactor are described. Tory II-A was an engineering test reactor, built and tested to gain information on the materials, engineering, and physics problems. The available air allowed fullpower full-temperature operation of the reactor for a period of less thand two minutes. The reactor was first operated at 50 Mw in May 1961. In late September and early October of 1961 the reactor was tsken to high power three times in succession. These runs were followed by remote disassembly of the reactor. (M.C.G.)
Research Organization:
California. Univ., Livermore. Lawrence Radiation Lab.
DOE Contract Number:
W-7405-ENG-48
NSA Number:
NSA-17-042361
OSTI ID:
4684741
Report Number(s):
UCRL-7416; CONF-281-2
Country of Publication:
United States
Language:
English

Similar Records

Tory II-A reactor tests. Final report
Technical Report · Wed May 01 00:00:00 EDT 1963 · OSTI ID:4333186

TORY II-A--A NUCLEAR RAMJET TEST REACTOR
Technical Report · Sat Oct 31 23:00:00 EST 1959 · OSTI ID:4709933

Tory II-C hazards of operation: part 10 of the Tory II-C program
Technical Report · Thu Dec 27 23:00:00 EST 1962 · OSTI ID:4352655