skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Horizontal spacing, depletion, and infill potential in the Austin Chalk

Conference ·
OSTI ID:468140

There have been more than 4500 laterals drilled in the Austin Chalk. This paper looks at estimated ultimate recoveries (EUR) on a barrels/acre basis for these Austin Chalk wells. Baffels/acre recoveries were computed by estimating ultimate per-well recoveries, drilled density and the impact of vertical production. The data were then analyzed for depletion and infill potential. Certain areas were selected for further study using an artificial neural network. The network was built and used to study the effects of parameters such as lateral length, first production date, structure of the Austin Chalk, etc. on these recoverable barrel/acre numbers. The methodology and regional results of the study are reviewed with detailed analyses shown in selected areas.

OSTI ID:
468140
Report Number(s):
CONF-961003-; TRN: 96:006578-0034
Resource Relation:
Conference: 71. annual technical conference and exhibition of the Society of Petroleum Engineers, Denver, CO (United States), 6-9 Oct 1996; Other Information: PBD: 1996; Related Information: Is Part Of 1996 SPE annual technical conference and exhibition: Reservoir engineering; PB: 833 p.
Country of Publication:
United States
Language:
English

Similar Records

Horizontal exploitation of the Upper Cretaceous Austin Chalk of south Texas
Conference · Tue May 01 00:00:00 EDT 1990 · AAPG Bulletin (American Association of Petroleum Geologists); (USA) · OSTI ID:468140

A statistical approach to infill-drilling studies: Case history of the Ozona Canyon sands
Journal Article · Thu Aug 01 00:00:00 EDT 1996 · SPE Reservoir Engineering · OSTI ID:468140

Horizontal wells up odds for profit in Giddings Austin chalk
Journal Article · Mon Feb 17 00:00:00 EST 1992 · Oil and Gas Journal; (United States) · OSTI ID:468140