Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Steam generator tube inspection in Japan

Conference ·
OSTI ID:467902
 [1]
  1. Japan Power Engineering and Inspection Corp., Tokyo (Japan)

Steam generator tube inspection was first carried out in 1971 at Mihama Unit-1 that is first PWR plant in Japan, when the plant was brought into the first annual inspection. At that time, inspection was made on sampling basis, and only bobbin coil probe was used. After experiencing various kinds of tube degradations, inspection method was changed from sampling to all number of tubes, and various kinds of probes were used to get higher detectability of flaw. At present, it is required that all the tubes shall be inspected in their full length at each annual inspection using standard bobbin coil probe, and some special probes for certain plants that have susceptibility of occurrence of flaw. Sleeve repaired portion is included in this inspection. As a result of analyses of eddy current testing data, all indications that have been evaluated to be 20% wall thickness or deeper shall be repaired by either plugging or sleeving, where flaw morphology is to be a wastage or wear. Other types of flaw such as IGA/SCC are not allowed to be left inservice when those indications are detected. These inspections are performed according to inspection procedures that are approved by regulatory authority. Actual inspections are witnessed by the Japan Power engineering and inspection corporation (JAPEIC)`s inspectors during data acquisition and analysis, and they issue inspection report to authority for review and approval. It is achieved high safety performance of steam generator through this method of inspections, however. some tube leakage problems were experienced in the past. To prevent recurrence of such events, government is conducting development and verification test program for new eddy current testing technology.

Research Organization:
CH2M Hill, Gainesville, FL (United States); Argonne National Lab., IL (United States)
OSTI ID:
467902
Report Number(s):
NUREG/CP--0154; ANL--96/14; NEA/CNRA/R--(96)1; CONF-9510423--; ON: TI97004312
Country of Publication:
United States
Language:
English

Similar Records

Development and field validation of advanced array probes for steam generator inspection
Technical Report · Fri Mar 31 23:00:00 EST 1995 · OSTI ID:93875

Evaluation and field validation of Eddy-Current array probes for steam generator tube inspection
Technical Report · Mon Jul 01 00:00:00 EDT 1996 · OSTI ID:273824

Novel rotating field probe for inspection of tubes
Journal Article · Thu May 17 00:00:00 EDT 2012 · AIP Conference Proceedings · OSTI ID:22004029