Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

No. 5 blast furnace 1995 reline and upgrade

Conference ·
OSTI ID:460622

The 1995 reline of No. 5 Blast Furnace is an undertaking which has never been approached in previous relines of any blast furnace in the history of Wheeling Pittsburgh Steel Corporation. The scope of the project is such that it represents a radical departure from W.P.S.C.`s traditional methods of ironmaking. The reline of No. 5 Blast Furnace is one of the largest capital improvements performed at W.P.S.C. Blast Furnaces. The improvements made at one single time are taking a furnace from 1960`s technology into the 21st century. With this in mind, employee training was one of the largest parts of the project. Training for the automated stockhouse, castfloor, new skip drive, new instrumentation, new castfloor equipment, hydraulics and overall furnace operation were an absolute necessity. The reline has laid the ground work to give the Corporation an efficient, higher productive, modern Blast Furnace which will place W.P.S.C. in the world class category in ironmaking well into the 21st century.

OSTI ID:
460622
Report Number(s):
CONF-960317--; ISBN 1-886362-12-2
Country of Publication:
United States
Language:
English

Similar Records

Partnering and the WCI blast furnace reline
Journal Article · Fri Oct 31 23:00:00 EST 1997 · Iron and Steel Engineer · OSTI ID:562279

Modernization of USS/KOBE No. 3 blast furnace
Conference · Thu Dec 31 23:00:00 EST 1992 · Proceedings, Ironmaking Conference; (United States) · OSTI ID:6185475

Blast furnace repairs, relines and modernizations
Conference · Thu Sep 01 00:00:00 EDT 1994 · Iron and Steel Engineer; (United States) · OSTI ID:7136851