Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Advanced stimulation technology deployment program, Chevron USA Production Company, Wolfcamp A2 Sand, Pakenham Field, Val Verde Basin. Topical report, July 1995-March 1996

Technical Report ·
OSTI ID:459653
This report describes the results from Chevron`s Pakenham Field effort at fracture stimulation engineering which incorporated, to the greatest extent possible, the results of actual measured field data. Measurement of the sand-shale closure stress contrast around the Wolfcamp A2 sand and the relatively high net fracturing pressures (compared to the closure stress contrast) that were observed during real-data (net pressure) fracture treatment analysis revealed that fractures obtained in most of the treatments were much shorter and less confined than originally expected: the fracture half-length was about 200 to 300 ft (instead of about 600 ft), which is consistent with estimates from post-fracture pressure build-up tests. Based on these measurements, Chevron`s fracturing practices in the Pakenham Field could be carefully reviewed to enhance fracture economics. Supported by the real-data fracture treatment analysis, several changes in completion, fracture treatment design and data-collection procedures were made, such as: (1) using cheaper 20/40 Ottawa sand instead of pre-cured 20/40 resin coated sand; (2) reducing the pad fluid size, as fluid leakoff from the fracture into the formation was relatively low; and, (3) utilizing stepdown tests and proppant slugs to minimize near-wellbore screen-out potential (in the Wolfcamp D sand).
Research Organization:
Pinnacle Technologies, Inc., San Francisco, CA (United States)
OSTI ID:
459653
Report Number(s):
PB--97-140438/XAB; CNN: Contract GRI-5094-210-3262
Country of Publication:
United States
Language:
English

Similar Records

Fracture treatment design and evaluation in the Pakenham Field: A real-data approach
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:457328

Mechanisms controlling fracture-height growth in layered media
Journal Article · Tue May 01 00:00:00 EDT 1990 · SPE (Society of Petroleum Engineers) Production Engineering; (USA) · OSTI ID:6778880

Robust technique for real-time closure stress determination
Journal Article · Thu Aug 01 00:00:00 EDT 1996 · SPE Production and Facilities · OSTI ID:276199