Title: Phillips Petroleum`s Seastar Project

Journal Article · · Sea Technology
OSTI ID:458991
 [1];  [2]
  1. Phillips Petroleum Co., Bellaire, TX (United States)
  2. Aker Engineering Inc., Houston, TX (United States)

On May 1, 1995 Phillips Petroleum`s Seastar Project began production as the first cluster-type subsea development in the Gulf of Mexico. Seastar production reached approximately 60 million cubic feet of gas per day (mmscfd) in November 1995 with the completion of a second {open_quotes}sales{close_quotes} line (a pipeline that transports the petroleum to shore) at the Vermilion Block 386-B host platform. Currently, the field is producing 40 to 50 mmscfd and plans are on schedule for the addition of a third producing well during the first quarter of 1997. All of the subsea equipment was installed using a drilling vessel and onboard ROV support. The Seastar project began in 1987 when Phillips and its partners leased Garden Banks Blocks 70 and 71, located 110 miles south of Cameron Louisiana. The partnership drilled two wells in 1990 that discovered noncommercial hydrocarbon reserves. Following a reevaluation of the seismic data, Phillips assumed 100 percent ownership in the leases and drilled Garden Banks 71 No. 2, which discovered 350 feet of {open_quotes}pay{close_quotes} sand (oil resource) in March 1993. The initial phase of the project consisted of two satellite subsea trees tied back to a four-slot retrievable subsea manifold in 760 feet of water. Commingled gas production is delivered via dual subsea pipelines to a host platform processing facility in 300 feet of water 13 miles away in Vermilion Block 386-B, thence via sales lines to shore.

OSTI ID:
458991
Journal Information:
Sea Technology, Vol. 38, Issue 2; Other Information: PBD: Feb 1997
Country of Publication:
United States
Language:
English