Examples of backfilling temporary underground structures and workings at hydroelectric stations in Russia are cited. Structures backfilled include temporary tunnels and auxiliary workings (shafts, chambers, etc.). Detail drawings illustrate many of the examples. Examples of backfilling at a number of hydropower plants are given; however, the main emphasis is on construction of Nurek Hydroelectric Station. 8 refs., 11 figs.
- Sponsoring Organization:
- USDOE
- OSTI ID:
- 457437
- Journal Information:
- Hydrotechnical Construction, Vol. 28, Issue 6; Other Information: PBD: Dec 1994; TN: Translated from Gidrotekhnicheskoe Stroitel`stvo; No. 6, 31-38(Jun 1994)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Enlarging the underground hydroelectric plant at Villarino, Spain
Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379
Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model. Zion Station Restoration Project
Conference
·
Thu May 01 00:00:00 EDT 1997
·
OSTI ID:457437
Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379
Conference
·
Sun Jul 01 00:00:00 EDT 2012
·
OSTI ID:457437
+2 more
Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model. Zion Station Restoration Project
Technical Report
·
Fri May 20 00:00:00 EDT 2016
·
OSTI ID:457437