Hot dry rock energy: Hot dry rock geothermal development program. Progress report. Fiscal year 1993
- eds.
Extended flow testing at the Fenton Hill Hot Dry Rock (HDR) test facility concluded in Fiscal Year 1993 with the completion of Phase 2 of the long-term flow test (LTFT) program. As is reported in detail in this report, the second phase of the LTFT, although only 55 days in duration, confirmed in every way the encouraging test results of the 112-day Phase I LTFT carried out in Fiscal Year 1992. Interim flow testing was conducted early in FY 1993 during the period between the two LTFT segments. In addition, two brief tests involving operation of the reservoir on a cyclic schedule were run at the end of the Phase 2 LTFT. These interim and cyclic tests provided an opportunity to conduct evaluations and field demonstrations of several reservoir engineering concepts that can now be applied to significantly increase the productivity of HDR systems. The Fenton Hill HDR test facility was shut down and brought into standby status during the last part of FY 1993. Unfortunately, the world`s largest, deepest, and most productive HDR reservoir has gone essentially unused since that time.
- Research Organization:
- Los Alamos National Lab., NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 45603
- Report Number(s):
- LA--12903-PR; ON: DE95009525
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hot Dry Rock energy annual report fiscal year 1992
Hot Dry Rock energy annual report fiscal year 1992
Using a Hot Dry Rock geothermal reservoir for load following
Technical Report
·
Wed Mar 31 23:00:00 EST 1993
·
OSTI ID:10161945
Hot Dry Rock energy annual report fiscal year 1992
Technical Report
·
Wed Mar 31 23:00:00 EST 1993
·
OSTI ID:6443299
Using a Hot Dry Rock geothermal reservoir for load following
Conference
·
Wed Jan 25 23:00:00 EST 1995
·
OSTI ID:889392