Title: Implement a site management strategy to save money and achieve timely closure

Abstract

Federal regulatory standards for remediation of contaminated groundwater have been technically impossible to meet within reasonable time frames and budgets. A site management strategy (SMS) defending alternate cleanup levels (ACLs) or technical impracticability (TI) waivers and characterizing risk, managing site data, and implementing a practical site remediation approach can be very effective in saving time and money at contaminated sites. The engineering and scientific communities have been looking for practical solutions to groundwater cleanup at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. Records of Decisions (RODs) and Corrective Measures Implementation Plans have historically specified cleanup standards for contaminated groundwater that are technically impossible to meet within reasonable time frames (such as drinking water standards). Restoration of drinking water standards was the cleanup goal for groundwater in 270 of approximately 300 Superfund RODs issued between 1987 and 1991. These statistics notwithstanding, very few sites contaminated with organic chemicals have been remediated to numerical groundwater standards.

Authors:
Publication Date:
OSTI Identifier:
452015
Report Number(s):
CONF-9611118-
TRN: IM9715%%47
Resource Type:
Conference
Resource Relation:
Conference: HazMat West `96. International environmental management and technology conference and exhibition, Long Beach, CA (United States), 5-7 Nov 1996; Other Information: PBD: 1996; Related Information: Is Part Of 12. annual environmental management and technology conference west -- HazMat `96 west: Technical papers; PB: 544 p.
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; REMEDIAL ACTION; ORGANIC COMPOUNDS; GROUND WATER; US SUPERFUND; RESOURCE RECOVERY ACTS; WATER POLLUTION

Citation Formats

Buratovich-Collins, J. Implement a site management strategy to save money and achieve timely closure. United States: N. p., 1996. Web.
Buratovich-Collins, J. Implement a site management strategy to save money and achieve timely closure. United States.
Buratovich-Collins, J. 1996. "Implement a site management strategy to save money and achieve timely closure". United States. doi:.
@article{osti_452015,
title = {Implement a site management strategy to save money and achieve timely closure},
author = {Buratovich-Collins, J.},
abstractNote = {Federal regulatory standards for remediation of contaminated groundwater have been technically impossible to meet within reasonable time frames and budgets. A site management strategy (SMS) defending alternate cleanup levels (ACLs) or technical impracticability (TI) waivers and characterizing risk, managing site data, and implementing a practical site remediation approach can be very effective in saving time and money at contaminated sites. The engineering and scientific communities have been looking for practical solutions to groundwater cleanup at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. Records of Decisions (RODs) and Corrective Measures Implementation Plans have historically specified cleanup standards for contaminated groundwater that are technically impossible to meet within reasonable time frames (such as drinking water standards). Restoration of drinking water standards was the cleanup goal for groundwater in 270 of approximately 300 Superfund RODs issued between 1987 and 1991. These statistics notwithstanding, very few sites contaminated with organic chemicals have been remediated to numerical groundwater standards.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = 1996,
month =
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share:
  • In 1992, Eaton Corporation (a major manufacturer of automotive, electronic controls and truck components) expedited installation of a groundwater recovery and treatment system to contain and remove a chlorinated solvent plume. The contamination (caused by a previous owner) was present in groundwater at significant concentrations in the unconsolidated material and fractured rock beneath the site. Standard groundwater project procedures typically involve completion of plume delineation prior to remediation. However, substantial delays were anticipated due to agency review of investigation reports and non-technical off site issues. Therefore, Eaton partnered with the state agency and initiated a ``fast track`` project approach. Thismore » paper presents a case history describing both project management methods and the technical approach used to expedite installation of the remediation system, and identify the resulting benefits. The approach allowed Eaton to bypass regulatory delays and install a barrier well system to contain and treat contaminated groundwater within eight months. It demonstrates how well established project management practices can be applied to site remediation to avoid costly delays, expedite project completion and protect the environment.« less
  • This paper presents an overview of the strategy for closure of part of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), which is about 65 miles northwest of Las Vegas, Nevada (Figure 1). The Area 5 RWMS is in the northern part of Frenchman Flat, approximately 14 miles north of Mercury. The Area 5 RWMS encompasses 732 acres subdivided into quadrants, and is bounded by a 1,000-foot (ft)-wide buffer zone. The northwest and southwest quadrants have not been developed. The northeast and southeast quadrants have been used for disposal of unclassified low-level radioactive wastemore » (LLW) and indefinite storage of classified materials. This paper focuses on closure of the 38 waste disposal and classified material storage units within the southeast quadrant of the Area 5 RWMS, called the ''92-Acre Area''. The U.S Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is currently planning to close the 92-Acre Area by 2011. Closure planning for this site must take into account the regulatory requirements for a diversity of waste streams, disposal and storage configurations, disposal history, and site conditions. For ease of discussion, the 92-Acre Area has been subdivided into six closure units defined by waste type, location, and similarity in regulatory requirements. Each of the closure units contains one or more waste disposal units; waste disposal units are also called waste disposal cells. The paper provides a brief background of the Area 5 RWMS, identifies key closure issues for the 92-Acre Area, recommends actions to address the issues, and provides the National Security Technologies, LLC (NSTec), schedule for closure.« less
  • Innovative scientific applications and emerging dense data sources are creating a data deluge for high-end computing systems. Processing such large input data typically involves copying (or staging) onto the supercomputer's specialized high-speed storage, scratch space, for sustained high I/O throughput. The current practice of conservatively staging data as early as possible makes the data vulnerable to storage failures, which may entail re-staging and consequently reduced job throughput. To address this, we present a timely staging framework that uses a combination of job startup time predictions, user-specified intermediate nodes, and decentralized data delivery to coincide input data staging with job start-up.more » By delaying staging to when it is necessary, the exposure to failures and its effects can be reduced. Evaluation using both PlanetLab and simulations based on three years of Jaguar (No. 1 in Top500) job logs show as much as 85.9% reduction in staging times compared to direct transfers, 75.2% reduction in wait time on scratch, and 2.4% reduction in usage/hour.« less
  • F-Area is a large nuclear complex located near the center of the Department of Energy's (DOEs) Savannah River Site in South Carolina. The present closure strategy for F-Area is based on established SRS protocol for a site-specific, graded approach to deactivation and decommissioning. Uncontaminated facilities will be closed under the National Environmental Policy Act (NEPA). Facilities requiring removal or in-situ disposition of residual chemical and/or radiological inventories will be decommissioned under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The F-Area Tank Farm, which is permitted under the Clean Water Act, will be closed in accordance with an industrialmore » wastewater closure plan. F-Area closure will also involve the near- and long-term remediation of contaminated soil and groundwater resources. The proposed holistic F-Area closure strategy would enhance the existing project-specific SRS closure protocol by incorporating a comprehensive area-wide groundwater modeling tool, or Composite Analysis. The use of this methodology would allow for the assessment of the relative impacts of individual projects, as well as the cumulative effect of all F-Area closure actions, on area groundwater resources. Other critical elements of the proposed strategy include (i) the consistent use of site-specific Risk Assessments (RAs) and Performance Assessments (PAs), (ii) the closer integration of selected soil and groundwater closure projects and near-term D and D projects, and (iii) the creation of an Area Core Team (ACT) consisting of DOE and selected regulator decision-makers to direct area D and D and environmental restoration activities. This holistic approach would facilitate the effective targeting of agency resources on high priority projects whose closure would have the greatest impact on achieving the desired area-wide risk-based end-state and accelerate delisting of F-Area from the National Priority List (NPL).« less
  • A performance-based approach is being used at the Savannah River Site to close the F area Complex. F Area consists of a number of large industrial facilities including plutonium separations, uranium fuel fabrication, tanks for storing high level waste and a number of smaller operations. A major part of the overall closure strategy is the use of techniques derived from the Performance Assessment and Composite Analysis requirements for low level waste disposal at DOE sites. This process will provide a means of demonstrating the basis for deactivation, decommissioning and closure decisions to management, stakeholders and regulators.