DIII-D radiative divertor project, status and plans
- Geneal Atomics, San Diego, CA (United States); and others
New divertor hardware is being designed and fabricated for the Radiative Divertor modification of the DIII-D tokamak. The installation of the hardware has been separated into two phases, the first phase starting in October of 1996 and the and second final phase, in 1988. When completed, the Radiative Divertor Project hardware will provide pumping at all four strike points of a double-null, high triangularity discharge and provide baffling of the neutral particles from transport back to the core plasma. Radiative Divertor diagnostics are being designed to provide comprehensive measurements for diagnosing the divertor. Minimal modifications are required to diagnostics for the Phase I installation. More extensive diagnostic changes are planned for the Phase 2 installation. 3 refs., 6 figs.
- DOE Contract Number:
- AC03-89ER51114; W-7405-ENG-48
- OSTI ID:
- 447395
- Report Number(s):
- CONF-9606116--
- Journal Information:
- Fusion Technology, Journal Name: Fusion Technology Journal Issue: 3 Vol. 30; ISSN 0748-1896; ISSN FUSTE8
- Country of Publication:
- United States
- Language:
- English
Similar Records
Structural design of the DIII-D radiative divertor
Diagnostics for the DIII-D radiative divertor