Final report for the Central Mercury Treatment System in Building 9623 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
This document discusses the construction of the Central Mercury Treatment System (CMTS) in Building 9623 at the Y-12 Plant, the remediation activities involved, waste generated from the project, and the monitoring schedule of the CMTS. As part of the Reduction of Mercury in Plant Effluent Program, the project treats groundwater contaminated with mercury from Buildings 9201-4, 9201-5, and 9204-4 at the Y-12 Plant to meet National Pollutant Discharge Elimination System (NPDES) Permit limits for discharge to East Fork Poplar Creek. The CMTS, located in Building 9623, will treat water from the sumps of buildings in which mercury was used in operations and which have been shown to be significant contributors to the overall levels of mercury in plant effluents. This project was anticipated when the NPDES Permit was issued, and the contamination limits and frequency of monitoring for the system discharge are detailed in the permit as Outfall 551. This project was performed as an Incentive Task Order and included the advance procurement of the carbon columns, removal of existing equipment in Building 9623, and system installation and checkout. Construction activities for installing the system started in January 1996 after the area in Building 9623 had been cleared of existing, obsolete equipment. The CMTS became operational on November 26, 1996, well ahead of the permit start date of January 1, 1998. The early completion date allows Hg concentrations in EFPC to be evaluated to determine whether further actions are required to meet NPDES permit limits for reduced Hg loading to the creek.
- Research Organization:
- Oak Ridge Y-12 Plant, TN (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC05-96OR22464
- OSTI ID:
- 446336
- Report Number(s):
- Y/ER--282; ON: DE97004308
- Country of Publication:
- United States
- Language:
- English
Similar Records
Phase 2 focused feasibility study report for the reduction of mercury in plant effluent project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
Engineering report for the Central Mercury Treatment System. Revision 1
Engineering report for the central mercury treatment system
Technical Report
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:132697
Engineering report for the Central Mercury Treatment System. Revision 1
Technical Report
·
Tue Feb 28 23:00:00 EST 1995
·
OSTI ID:5542748
Engineering report for the central mercury treatment system
Technical Report
·
Tue Feb 28 23:00:00 EST 1995
·
OSTI ID:405733