A case history of multi-disciplinary integration in an offshore Indonesian field
- and others
This is the first in a 2-part series describing the case history of how a multi-disciplinary team (MDT) used a 3-D survey and a reservoir simulation to review and revise the development plans for the BM platform, located in the B Field, Offshore Northwest Java, Indonesia. Part 1 of this series discusses the multi-disciplinary team`s (MDT) petrophysical, geologic, geophysical and production data gathering efforts. These data were then used to develop a reservoir simulation model which initially found no problems with the BM platform. However, the initial simulation had contradictions concerning input structure maps and fluid contacts. As the problems with the reservoir model appeared, a 3-D seismic survey was planned, which will also be discussed in Part 1.
- OSTI ID:
- 445647
- Journal Information:
- Petroleum Engineer International, Journal Name: Petroleum Engineer International Journal Issue: 2 Vol. 70; ISSN 0164-8322; ISSN PEEID4
- Country of Publication:
- United States
- Language:
- English
Similar Records
BM platform, B Field, Offshore Northwest Java: A case history of multi-disciplinary integration including 3D seismic, reservoir simulation and horizontal drilling
A multi-disciplinary approach to horizontal well planning in the Prudhoe Bay Field, Alaska