Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

A case history of multi-disciplinary integration in an offshore Indonesian field

Journal Article · · Petroleum Engineer International
OSTI ID:445647

This is the first in a 2-part series describing the case history of how a multi-disciplinary team (MDT) used a 3-D survey and a reservoir simulation to review and revise the development plans for the BM platform, located in the B Field, Offshore Northwest Java, Indonesia. Part 1 of this series discusses the multi-disciplinary team`s (MDT) petrophysical, geologic, geophysical and production data gathering efforts. These data were then used to develop a reservoir simulation model which initially found no problems with the BM platform. However, the initial simulation had contradictions concerning input structure maps and fluid contacts. As the problems with the reservoir model appeared, a 3-D seismic survey was planned, which will also be discussed in Part 1.

OSTI ID:
445647
Journal Information:
Petroleum Engineer International, Journal Name: Petroleum Engineer International Journal Issue: 2 Vol. 70; ISSN 0164-8322; ISSN PEEID4
Country of Publication:
United States
Language:
English

Similar Records

A case history of multidisciplinary integration in an offshore Indonesian field
Journal Article · Fri Feb 28 23:00:00 EST 1997 · Petroleum Engineer International · OSTI ID:458486

BM platform, B Field, Offshore Northwest Java: A case history of multi-disciplinary integration including 3D seismic, reservoir simulation and horizontal drilling
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:468119

A multi-disciplinary approach to horizontal well planning in the Prudhoe Bay Field, Alaska
Conference · Sun Jan 31 23:00:00 EST 1993 · AAPG Bulletin (American Association of Petroleum Geologists); (United States) · OSTI ID:6101757