ORMAK-F/BX facility: preliminary considerations
In view of the anticipated needs of the U. S. CTR program in the late 1970's, consideration is being given to a large, flexible tokamak facility. This facilit gamma would be used first for experiments with H plasma to demonstrate the scientific feasibility of fusion in an injection-heated tokamak. Then, parts of the device would be modified as necessary, and planned shielding and containment features would be added to permit D-- T burning experiments. A 10- manyear conceptual design study of such a facility is to be accomplished in FY1974 by scientists and engineers at ORNL. The project is called ORMAK-F/BX for Oak Ridge Tokamak Feasibility and Burning Experiments. The initial estimates of system parameters, the questions to be addressed, and the organization for the studv are described. (auth)
- Research Organization:
- Oak Ridge National Lab., Tenn. (USA)
- DOE Contract Number:
- W-7405-ENG-26
- NSA Number:
- NSA-29-001908
- OSTI ID:
- 4412106
- Report Number(s):
- ORNL-TM--4342
- Country of Publication:
- United States
- Language:
- English
Similar Records
Conceptual design study for the ORMAK-F/BX facility
User's manual for ODDBALL, ORMAK device data base analyzing Lukasiewicz language
High power electron cyclotron heating in ISX and ORMAK Upgrade at ORNL
Conference
·
Sun Dec 31 23:00:00 EST 1972
·
OSTI ID:4415739
User's manual for ODDBALL, ORMAK device data base analyzing Lukasiewicz language
Technical Report
·
Fri Dec 31 23:00:00 EST 1976
·
OSTI ID:7127569
High power electron cyclotron heating in ISX and ORMAK Upgrade at ORNL
Technical Report
·
Sat May 01 00:00:00 EDT 1976
·
OSTI ID:7278783