ORMAK-F/BX facility: preliminary considerations

Technical Report ·
DOI:https://doi.org/10.2172/4412106· OSTI ID:4412106
In view of the anticipated needs of the U. S. CTR program in the late 1970's, consideration is being given to a large, flexible tokamak facility. This facilit gamma would be used first for experiments with H plasma to demonstrate the scientific feasibility of fusion in an injection-heated tokamak. Then, parts of the device would be modified as necessary, and planned shielding and containment features would be added to permit D-- T burning experiments. A 10- manyear conceptual design study of such a facility is to be accomplished in FY1974 by scientists and engineers at ORNL. The project is called ORMAK-F/BX for Oak Ridge Tokamak Feasibility and Burning Experiments. The initial estimates of system parameters, the questions to be addressed, and the organization for the studv are described. (auth)
Research Organization:
Oak Ridge National Lab., Tenn. (USA)
DOE Contract Number:
W-7405-ENG-26
NSA Number:
NSA-29-001908
OSTI ID:
4412106
Report Number(s):
ORNL-TM--4342
Country of Publication:
United States
Language:
English