Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

CAPITAL AND DIRECT AND INDIRECT OPERATING COST ESTIMATES FOR MILL FOR RECOVERING URANIUM FROM LOW-GRADE ORE WITH THE HIGGINS CONTINUOUS ION EXCHANGE CONTACTOR

Technical Report ·
DOI:https://doi.org/10.2172/4352664· OSTI ID:4352664
The capital and direct and indirect operating costs were estimated for erecting and operating mills of 220 and 440 tons of ore per day capacity. The ores considered contained 0.15 or 0.30% uranium. The processes considered included crushing, grinding, acid or carbonate leaching, and final recovery of the U/sub 3/O/sub 8/ in a Higgins ion exchange contuctor with a 5 M NaCl, 1 M NaCl, 1 M NH/sub 4/NC/sub 3/, or 1 M cost estimate have been given due and careful consideration with reference to requirements for a mill of this type. Further detailed information with reference to the construction and operation characteristics of the Higgins ion exchange contactor are given in ORNL reports 1907 and 1918. (auth)
Research Organization:
Oak Ridge National Lab., Tenn.
DOE Contract Number:
W-7405-ENG-26
NSA Number:
NSA-12-007741
OSTI ID:
4352664
Report Number(s):
CF-55-10-127
Country of Publication:
United States
Language:
English