Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RESEARCH AND DEVELOPMENT IN THE FIELD OF THORIUM CHEMISTRY AND METALLURGY. Monthly Progress Report for April 16 to May 15, 1955

Technical Report ·
DOI:https://doi.org/10.2172/4347823· OSTI ID:4347823
A continuous belt drier capable of handling 1000 lbs of oxycarbonate per day was completed, installed, and operated to produce a satisfactory product for chlorination. An experimental chlorinator was also completed. All necessary pants were completed for the fabrication of Horizons' Mark VI continuous electrolytic cell. Evaluations of oxycarbonate materials for chlorination wiih varying chlorinating agents were made, and many of the variables such as water content and CO/sub 2/ values were established. Extremely ductile rods were obtained from the direct extrusion of Th metal powder. Plans were completed for the Mark VI electrolytic cell. Work was continued toward the development of a semi-continuous operating electrolytic cell of 7500-a rated capacity. (D.E.B.)
Research Organization:
Horizons, Inc., Cleveland
Sponsoring Organization:
USDOE
NSA Number:
NSA-12-001902
OSTI ID:
4347823
Report Number(s):
SRO-21; HZ-25
Country of Publication:
United States
Language:
English