MANUFACTURE OF U-Mo RODS FOR IRRADIATION AT CHALK RIVER IN THE X-2 LOOP
Technical Report
·
OSTI ID:4347376
Zircaloy-2 clad Uranium --12 wt.% Mo rods were fabricated for testing in the X-2 loop at Chalk River. The fuel was duplex melted. The rods were manufactured by co-extruding the fuel alloy in Zircaloy cups to size. End closures on individual rods were made by resistance butt welding and fusion welding over the resistance butt weld. (auth)
- Research Organization:
- Westinghouse Electric Corp. Atomic Power Div., Pittsburgh
- DOE Contract Number:
- AT(11-1)-GEN-14
- NSA Number:
- NSA-12-002001
- OSTI ID:
- 4347376
- Report Number(s):
- WAPD-123
- Country of Publication:
- United States
- Language:
- English
Similar Records
MANUFACTURE OF URANIUM-NIOBIUM FUEL RODS FOR IRRADIATION IN THE MATERIALS TESTING REACTOR
FABRICATION OF ZIRCALOY-2 CLAD URANIUM-12 WT PCT MOLYDENUM FUEL RODS
STUDIES OF METHODS FOR SEALING ENDS OF REACTOR FUEL RODS FOR PWR
Technical Report
·
Fri Sep 16 00:00:00 EDT 1955
·
OSTI ID:4327890
FABRICATION OF ZIRCALOY-2 CLAD URANIUM-12 WT PCT MOLYDENUM FUEL RODS
Journal Article
·
Tue Dec 31 23:00:00 EST 1957
· Am. Inst. Mining Met. Petrol. Engrs., Inst. Metals Div., Spec. Rept. Ser.
·
OSTI ID:4253235
STUDIES OF METHODS FOR SEALING ENDS OF REACTOR FUEL RODS FOR PWR
Journal Article
·
Sat Oct 01 00:00:00 EDT 1960
· Welding J.(N.Y.)
·
OSTI ID:4126427