Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

BP Exploration`s Pompano subsea development: Operational strategy for a subsea project

Conference ·
OSTI ID:434027

On a platform, facility modifications to cope with unexpected operating conditions or unanticipated problems may be made relatively easily at moderate cost. In contrast, subsea systems are placed on the seabed often beyond diver depth and are difficult if not impossible to retrieve or modify. Consequently the design must be optimized up front and have sufficient inherent flexibility to cope with the unexpected. It is therefore critical to develop an operational strategy in conjunction with suppliers, designers and operational staff, concurrently with the design. Input from Operations personnel is necessary from project conception throughout detailed design, fabrication, system integrating testing, installation and commissioning. This paper discusses BP Exploration`s work on the Pompano subsea project in the Gulf of Mexico and addresses many of the practical aspects in which Operations staff need to become involved with throughout a subsea project to ensure a problem free start-up and operation. It will provide a useful guide for Operations groups involved in the planning and operation of a subsea development

OSTI ID:
434027
Report Number(s):
CONF-960525--
Country of Publication:
United States
Language:
English