The Heidrun Field -- Heidrun TLP tether system
Conference
·
OSTI ID:433955
The Heidrun TLP was installed in July, 1995. The tether system was developed to meet the following requirements: preinstall the tether strings before platform installation; commission the tether tension monitoring system before platform tow to field; lock-off on all sixteen tethers simultaneously; 50-year platform design life; inspection, maintenance, and repair capability over the operating life. The system and component designs, operations trials, and experience to date are summarized.
- OSTI ID:
- 433955
- Report Number(s):
- CONF-960525--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Heidrun concrete TLP: Update
The Heidrun Field: TLP global performance and hydrodynamics
The Heidrun Field -- Development overview
Conference
·
Sun Oct 01 00:00:00 EDT 1995
·
OSTI ID:100725
The Heidrun Field: TLP global performance and hydrodynamics
Book
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:433953
The Heidrun Field -- Development overview
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:433942