skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The Troll oil floater: The first concrete floater platform

Conference ·
OSTI ID:433633

The Troll Olje platform is the first catenary-moored concrete floater ever built. Detail engineering commenced in November 1992, and the substructure should be ready mechanical complete by December 1994. The main challenge has been to develop, design and fabricate a new concept within a tight schedule. This paper describes the main features of the concrete floater and gives an overview of some of the experience gained during the development of the concept.

OSTI ID:
433633
Report Number(s):
CONF-940409-; ISBN 1-880653-10-9; TRN: IM9709%%66
Resource Relation:
Conference: 4. international conference on offshore and polar engineering, Osaka (Japan), 10-15 Apr 1994; Other Information: PBD: 1994; Related Information: Is Part Of The proceedings of the fourth (1994) international offshore and polar engineering conference. Volume 4; Ueda, Yukio; Tomita, Yasumitsu [eds.] [Osaka Univ. (Japan)]; Dos Santos, J.F. [ed.] [GKSS Forschungszentrum Geesthacht (Germany)]; Langen, I. [ed.] [Statoil, Stavanger (Norway)]; Waagaard, K. [ed.] [Veritec, Hovik (Norway)]; PB: 692 p.
Country of Publication:
United States
Language:
English