The Troll oil floater: The first concrete floater platform
Conference
·
OSTI ID:433633
The Troll Olje platform is the first catenary-moored concrete floater ever built. Detail engineering commenced in November 1992, and the substructure should be ready mechanical complete by December 1994. The main challenge has been to develop, design and fabricate a new concept within a tight schedule. This paper describes the main features of the concrete floater and gives an overview of some of the experience gained during the development of the concept.
- OSTI ID:
- 433633
- Report Number(s):
- CONF-940409-; ISBN 1-880653-10-9; TRN: IM9709%%66
- Resource Relation:
- Conference: 4. international conference on offshore and polar engineering, Osaka (Japan), 10-15 Apr 1994; Other Information: PBD: 1994; Related Information: Is Part Of The proceedings of the fourth (1994) international offshore and polar engineering conference. Volume 4; Ueda, Yukio; Tomita, Yasumitsu [eds.] [Osaka Univ. (Japan)]; Dos Santos, J.F. [ed.] [GKSS Forschungszentrum Geesthacht (Germany)]; Langen, I. [ed.] [Statoil, Stavanger (Norway)]; Waagaard, K. [ed.] [Veritec, Hovik (Norway)]; PB: 692 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Design, fabrication and installation of the mooring system for the Troll B concrete oil production platform
Troll oil: The first concrete FPS
Feasibility of Floating Platform Systems for Wind Turbines: Preprint
Conference
·
Tue Dec 31 00:00:00 EST 1996
·
OSTI ID:433633
Troll oil: The first concrete FPS
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:433633
Feasibility of Floating Platform Systems for Wind Turbines: Preprint
Conference
·
Sat Nov 01 00:00:00 EST 2003
·
OSTI ID:433633