Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RESULTS OF PACKAGE BOILER TEST. HRT Test No. V 4a

Technical Report ·
DOI:https://doi.org/10.2172/4332998· OSTI ID:4332998

The package boiler was operated at a maximum steam rate of 1750 Ib/hr at 1500 psi. The operation of the pumps, relief valves, gages, and pressure controller was checked. The time required for the boiler to come up to full operation was 15 to 20 min. On the basis of the test the boiler is considered to meet the manufacturer's specifications. (auth)

Research Organization:
Oak Ridge National Lab., Tenn.
Sponsoring Organization:
US Atomic Energy Commission (AEC)
DOE Contract Number:
W-7405-ENG-26
NSA Number:
NSA-12-000832
OSTI ID:
4332998
Report Number(s):
CF-56-6-165
Country of Publication:
United States
Language:
English

Similar Records

REED BESLER BOILER HIGH PRESSURE STEAM SYSTEM AND THERMAL CYCLING FACILITY. Summary Report
Technical Report · Tue Feb 11 23:00:00 EST 1958 · OSTI ID:4350112

Steam generating system including means for reinitiating the operation of a steam bound boiler feed pump
Patent · Tue Apr 26 00:00:00 EDT 1977 · OSTI ID:7257554

EC Hidraulic Drive Cylinder Relief Vlave Test
Technical Report · Tue Apr 02 23:00:00 EST 1991 · OSTI ID:1031801