PWR SIMULATOR STUDIES FOR JANUARY-MARCH, 1958
Technical Report
·
OSTI ID:4322086
The results of analog computer studies of the PWR Primary Plant are presented. These transient studies were made to obtain expected results for several of the tests which will be run on the Shippingport Reactor Power Plant. The computer transients included are: design load swings; controlled steam relief system performance; control rod withdrawal transients; and startup transients. A brief description of the plant operating condition and scope for each of the four types of transients is given. A complete list of figues of simulator recording is included. (W.L.H.)
- Research Organization:
- Westinghouse Electric Corp. Bettis Plant, Pittsburgh
- DOE Contract Number:
- AT(11-1)-GEN-14
- NSA Number:
- NSA-12-011860
- OSTI ID:
- 4322086
- Report Number(s):
- WAPD-PWR-PC-1338
- Country of Publication:
- United States
- Language:
- English
Similar Records
PWR SIMULATOR STUDIES. SERIES III
CONTROL ROD WITHDRAWAL TRANSIENTS. Test Evaluation, DLCS 2760101 DLCS 2760201
SHIPPINGPORT PWR CORE I FUEL COMPONENT FABRICATION PROCESS AND EQUIPMENT MANUAL
Technical Report
·
Fri Dec 31 23:00:00 EST 1954
·
OSTI ID:4330431
CONTROL ROD WITHDRAWAL TRANSIENTS. Test Evaluation, DLCS 2760101 DLCS 2760201
Technical Report
·
Thu Nov 30 23:00:00 EST 1961
·
OSTI ID:4804846
SHIPPINGPORT PWR CORE I FUEL COMPONENT FABRICATION PROCESS AND EQUIPMENT MANUAL
Technical Report
·
Tue Dec 31 23:00:00 EST 1957
·
OSTI ID:4302326