Preoperational and startup testing experience at Fort St. Vrain nuclear generating station
Conference
·
OSTI ID:4305778
From joint power generating conference; Boston, Massachusetts, USA (11 Sep 1972). The unique characteristics of the Fort St. Vrain Nuclear Generating Station are described. The special requirements for preoperational and startup testing of this second generation HighTemperature Gas-Cooled Reactor are reviewed. Actual experience during testing of several reactor plant systems is described. The startup testing program is also described. 5 references. (auth)
- Research Organization:
- Gulf General Atomic Co., San Diego, Calif. (USA)
- NSA Number:
- NSA-29-031192
- OSTI ID:
- 4305778
- Report Number(s):
- GULF-GA-A--12244; CONF-7209110--1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fort St. Vrain startup and operating experience
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 1. Preoperational testing
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 3. Initial startup and operation at power phase. Key phase report
Conference
·
Sat Dec 31 23:00:00 EST 1977
· Proc. Am. Power Conf.; (United States)
·
OSTI ID:6022591
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 1. Preoperational testing
Technical Report
·
Tue Jan 31 23:00:00 EST 1978
·
OSTI ID:5130276
Comprehensive study of the operating and testing experience during the startup and initial operation at the Fort St. Vrain HTGR. Phase 3. Initial startup and operation at power phase. Key phase report
Technical Report
·
Thu Jun 01 00:00:00 EDT 1978
·
OSTI ID:6714298