REACTOR ANALYSIS FOR THE ARMY PACKAGE POWER REACTOR NO. 1
Technical Report
·
OSTI ID:4301685
The reactor analysis of the critical experiment and thc APPR-I resulted in a loading of the APPR-1 of 2I.098 gm of B-I0 with 22.5 kg U-235. This loading will rcsult ln adequate reactlvity for a core life of I3 MWYR bascd on uniform burnup of U-235 and B-10. Calculations iindicate that five of the seven control rods provided are more than adequate to shut the reactor down at any time. The temperature coefficient of reactivity should be at least -2 x 10/sup -4/ DELTA K/ deg F. (auth)
- Research Organization:
- Alco Products, Inc., Schenectady, N.Y.
- NSA Number:
- NSA-13-000954
- OSTI ID:
- 4301685
- Report Number(s):
- APAE-7
- Country of Publication:
- United States
- Language:
- English
Similar Records
REACTOR ANALYSIS FOR ARMY PACKAGE POWER REACTOR NO. 1
ARMY PACKAGE POWER REACTOR PROJECT PROGRESS REPORT FOR 1958
CORE CHARACTERISTICS OF FOUR ARMY PACKAGE POWER REACTORS
Technical Report
·
Tue May 29 00:00:00 EDT 1956
·
OSTI ID:4315576
ARMY PACKAGE POWER REACTOR PROJECT PROGRESS REPORT FOR 1958
Technical Report
·
Tue Mar 31 19:00:00 EST 1959
·
OSTI ID:4796804
CORE CHARACTERISTICS OF FOUR ARMY PACKAGE POWER REACTORS
Journal Article
·
Mon Jun 01 00:00:00 EDT 1959
· Nuclear Sci. and Eng.
·
OSTI ID:4225159