DESIGN, CONSTRUCTION, AND OPERATION OF ENGINEERING TEST REACTOR
Technical Report
·
OSTI ID:4301245
Papers are included on need for testing reactors, experimental facilities and program, operating philosophy procedures and costs, operationnl safety, core characteristics and control system, vessel and shielding;, cooling system, materials and fabrication problems, design considerations of hazards and safety, construction, and inspection. (W.D.M.)
- Research Organization:
- Idaho Operations Office, AEC; Phillips Petroleum Co. Atomic Energy Div., Idaho Falls, Idaho; Kaiser Engineers Div., Henry J. Kaiser Co., Oakland, Calif.; and General Electric Co. Atomic Power Equipment Dept., Schenectady, N. Y.
- NSA Number:
- NSA-12-015853
- OSTI ID:
- 4301245
- Report Number(s):
- TID-7552
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
DESIGN AND SAFEGUARDS CONSIDERATIONS OF THE THIRTY MEGAWATT GENERAL ELECTRIC TEST REACTOR
ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE
CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE
Technical Report
·
Thu Oct 30 23:00:00 EST 1958
·
OSTI ID:4326328
ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE
Technical Report
·
Wed Dec 14 23:00:00 EST 1960
·
OSTI ID:4765176
CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE
Technical Report
·
Thu Dec 31 23:00:00 EST 1959
·
OSTI ID:4118837