ELK RIVER REACTOR PROJECT QUARTERLY REPORT NO. 1 FOR JUNE, JULY, AUGUST 1958
Engineering and design of the Elk River Reactor was initiated on May 29, 1958. The AEC contract provides for ACF, as prime contractor, to design, develop, fabricate, construct, start-up, and test operate a closed cycle boiling water reactor and related equipment and train operating personnel. The reactor plant is to consist of a 58 Mwh, heterogeneous, light water moderated and cooled, natural circulation, closed cycle boiling water reactor and separately fired superheater. The initial work on hazards studies, fuel element development, and -oeei (lB-iedO -sno(jjpuoo dou~re~s pus lQqIon qloq ro3 a1npe?o1d Bnfls1Sdo aql sa (le# SQ'uad~ oS(e sI -oeer llQ-iadO -snojjTpuoo doue81e~s pus lQ~1on qloq reactor vessel is reported. Construction progress is indicated. (W.D.M.)
- Research Organization:
- Nuclear Products-Erco Div., ACF Industries, Inc., Washington, D.C.
- NSA Number:
- NSA-13-005941
- OSTI ID:
- 4294807
- Report Number(s):
- AECU-3991; ACF-ERR-1
- Country of Publication:
- United States
- Language:
- English
Similar Records
ELK RIVER REACTOR. Quarterly Project Report for March-April-May 1959
CONSTRUCTION OF THE ARGONNE LOW POWER REACTOR