PERIODIC VALVE OPERATING SYSTEM PERFORMANCE TEST. SECTION I. FIRST PERFORMANCE. Test Results DL-S-216 (T-641114)
Technical Report
·
OSTI ID:4282109
The purpose of this test is to determine that the system operating pressure is sufficient to meet system design requirements and also to check if leakage occurs through the hydraulic pilot valves. All main hydraulic stop valves operated within the prescribed time limits. Leakage from the system could not be determined because of the unavailability of a proper range test gage at the time the test was performed. The alignment check of the three-way selector valves was not penformed because of insufficient match marks on the valves. (auth)
- Research Organization:
- Duquesne Light Co., Shippingport, Penna.
- NSA Number:
- NSA-13-004266
- OSTI ID:
- 4282109
- Report Number(s):
- AECU-3979
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
PERIODIC VALVE OPERATING SYSTEM PERFORMANCE TEST. SECTION I. SECOND PERFORMANCE. Test Results DL-S-216 (T-641114)
VALVE OPERATING SYSTEM DRIFT TEST. Test Evaluation DL-S-200 (T-641109). Period II
MAIN HYDRAULIC VALVE THERMAL SHOCK TEST. Test Evaluation DL-S-188 (T- 612108)
Technical Report
·
Fri Jul 10 00:00:00 EDT 1959
·
OSTI ID:4202976
VALVE OPERATING SYSTEM DRIFT TEST. Test Evaluation DL-S-200 (T-641109). Period II
Technical Report
·
Fri Oct 17 00:00:00 EDT 1958
·
OSTI ID:4247624
MAIN HYDRAULIC VALVE THERMAL SHOCK TEST. Test Evaluation DL-S-188 (T- 612108)
Technical Report
·
Sun Feb 23 23:00:00 EST 1958
·
OSTI ID:4282073